Australian construction firms are getting paid later because late payment has widened across the whole economy, with 13% of construction invoices now more than 60 days overdue against 6% a year earlier (CreditorWatch Business Risk Index, September 2026). AI cannot make a client pay, but it can shorten the half of the payment cycle a builder controls.
The idea
The payment cycle in a construction business has two halves, and only one of them belongs to the client. The first half runs from the work being done to the payment claim being served, complete and properly evidenced. The second half runs from service to money in the account, and the contract and Security of Payment legislation govern that half rather than how organised the builder is.
Most of the attention goes to the second half, which is the half a builder cannot do much about. The Payment Times Reporting Regulator found large reporting entities paid only 57.4% of construction invoices within 30 days against 69.8% across all industries, with an average construction payment time of 30.9 days (Payment Times Reporting Regulator, August 2026, 297 construction reporting entities, Reporting Cycle 10). No amount of chasing changes those numbers.
The first half is different, because every business day between month end and the claim being served is a business day of the builder's own cash funding somebody else's project.
Why it matters
Timing is the part of the payment cycle an Australian construction firm can move on its own, and Security of Payment legislation puts hard dates around it. Victoria now caps payment terms at 20 business days under the Building and Construction Industry Security of Payment Act 2002, as amended by the Building Legislation Amendment (Fairer Payments on Jobsites and Other Matters) Act 2025, which commenced on 15 April 2026 and applies retrospectively to existing contracts. The same amendments repealed the excluded amounts concept, so delay costs and latent condition compensation can now be claimed, and they took 22 December to 10 January out of the definition of a business day.
The Christmas exclusion in the Victorian Act is a this-quarter problem rather than a next-year one, because a builder who lets the December claim slip can find work done between 22 and 31 December unclaimable until 31 January unless the contract provides otherwise.
Australian building and construction productivity now sits 21.5% below where it was just over a decade ago, a seventh consecutive year of decline (Master Builders Australia, February 2026, citing ABS multifactor productivity data), and KPMG puts the prize at around A$56 billion a year if the sector matched the economy-wide average (KPMG Global Construction Survey 2025/2026). An owner cannot bank a national number, whilst a claim served five business days earlier every month is one they can.
The Alvo take
The first useful AI job in an Australian construction business is contract administration, not design and not estimating. Contract administration recurs every month and is already documented, so the result turns up in the bank account rather than in a survey response. Reporting, contract administration, and payments and claims were the three areas construction project managers most wanted AI help with, at 84.3%, 63.9% and 53.7% (Mastt, State of AI in Construction Project Management, July 2026). Worth flagging that the Mastt sample is 108 project management professionals globally, recruited through its own channels, so read it as a signal rather than an Australian benchmark.
Here is the monthly claim cycle before and after. The "common today" column is what Alvo sees inside Australian builders of roughly $5M to $50M revenue, and is an observation rather than a published figure.
| Step in the monthly claim | Common today | With AI assembling the pack |
|---|---|---|
| Site records for the period | Diaries, dockets and photographs spread across three apps and a phone | Pulled into one dated record against the contract schedule as the work happens |
| Variations | Found at month end, some instructed verbally and never written up | Flagged at the point of instruction with the approval trail attached |
| Claim drafting | Contract administrator rebuilds the pack over two to three days | Draft pack and covering narrative produced in hours for review |
| Claim served | 5 to 7 business days after month end | 1 to 2 business days after month end |
| Payment schedule response | Chased by phone when somebody remembers | Statutory dates diarised at service, with the response gap flagged |
The arithmetic on a mid-sized builder, with every input shown:
- Revenue $12M a year, claimed monthly, so an average claim of $1,000,000
- Claim currently served 7 business days after month end, target 2 business days (an Alvo assumption to test against your own last six claims, not a published figure)
- 5 business days earlier on a 30 day month brings forward $1,000,000 x 5/30, or ~$167,000, once, and holds it
- At 9.5% on a debtor finance or overdraft facility (use your own rate, not a published figure), ~$167,000 costs ~$15,900 a year
- Separately, 13% of a $1,000,000 claim sitting past 60 days is $130,000, against $60,000 at last year's 6% rate, so ~$70,000 more cash locked up, costing ~$6,650 a year at the same rate
- Total ~$22,500 a year in finance cost on a $12M builder, before counting the variations that were instructed and never claimed
The variations are usually the bigger number, and only the builder can produce it, by going back through the last two completed projects and totalling what was instructed against what was claimed.
Worth being clear about what AI does not touch here. It does not value the work or decide what gets served, and the contract administrator still signs the statutory declaration, which is why this is an assembly job rather than a decision job and one of the few AI pathways in construction with no professional liability sitting underneath it.
Alvo runs this as a claim cycle review: a couple of weeks inside the builder's own project records and contract administration workflow, measuring days from month end to service, variations instructed against variations claimed, and what the gap is worth at the builder's cost of funds.
Frequently asked questions
Why are our progress claims taking longer to get paid?
Late payment has widened across the Australian economy rather than being specific to one builder. CreditorWatch found 13% of construction invoices were more than 60 days overdue in September 2026, double the 6% recorded a year earlier, and only 48% of all invoices were paid by their due date. Part of the delay is client behaviour and part is incomplete claims.
Can AI actually prepare a progress claim?
AI can assemble the claim rather than decide it. It can pull site diaries, delivery dockets, photographs, timesheets and variation approvals into a claim pack against the contract schedule, draft the covering narrative, and flag work completed in the period that nobody has claimed. The contract administrator still sets the quantities, the valuation and what gets served.
What is the maximum payment term under Security of Payment in Victoria?
Victoria caps payment terms at 20 business days under the Building and Construction Industry Security of Payment Act 2002, as amended by the Building Legislation Amendment (Fairer Payments on Jobsites and Other Matters) Act 2025, which commenced on 15 April 2026. Where a contract specifies no payment period, payment falls due 10 business days after the claim is served.
Does the Christmas shutdown change when we can claim in Victoria?
Yes, in Victoria. The amended Security of Payment Act excludes 22 December to 10 January from the definition of a business day. Claims for work done from 1 to 21 December can be served on or from 22 December, and claims for work done from 22 to 31 December can be served on or from 31 January, unless the contract provides otherwise.
Where should a small Australian construction firm start with AI?
Start with the monthly claim cycle, because it recurs, it is documented, and the result shows up in the bank rather than in a survey. Measure how many business days pass between month end and the claim being served, run one project with the evidence pack assembled as the work happens, then compare the days and the value of variations claimed.
Sources
Accessed 8 November 2026.
- CreditorWatch Business Risk Index, September 2026, published 22 October 2026: https://creditorwatch.com.au/blog/late-payments-trade-defaults-september-2026
- Accounting Times coverage of the same index, 22 October 2026: https://www.accountingtimes.com.au/profession/insolvency-outlook-bleak-as-late-payments-spike-to-8-5-year-highs
- Payment Times Reporting Regulator, Regulator's Update, August 2026 (Reporting Cycle 10, 1 July to 31 December 2025): https://paymenttimes.gov.au/sites/ptrs.gov.au/files/2026-08/regulators-update-august-2026.pdf
- Maddocks, Security of Payment reforms in Victoria, published 31 October 2025 and updated 14 April 2026: https://www.maddocks.com.au/insights/the-security-of-payment-bill
- Master Builders Australia on ABS multifactor productivity data, 6 February 2026: https://masterbuilders.com.au/latest-construction-productivity-decline-is-a-call-to-action/
- KPMG Global Construction Survey 2025/2026, Australian findings: https://kpmg.com/au/en/insights/industry/global-construction-survey.html
- Mastt, State of AI in Construction Project Management 2026, published 23 July 2026 (108 respondents globally, surveyed March to June 2026): https://www.mastt.com/research/ai-in-construction-project-management-2026